Plymouth railway station

Plymouth
Location
Place Plymouth
Local authority Plymouth
Operations
Station code PLY
Managed by First Great Western
Number of platforms 6
Live arrivals/departures and station information
from National Rail Enquiries
Annual rail passenger usage
2002/03 *   1.432 million
2004/05 * 1.519 million
2005/06 * 1.629 million
2006/07 * 1.846 million
2007/08 * 2.026 million
2008/09 * 2.250 million
2009/10 * 2.279 million
History
Original company GWR and LSWR Joint
Post-grouping GWR and SR Joint
1877 Opened
1938 Rebuilding started
1958 "North Road" name dropped
1962 Rebuilding completed
National Rail - UK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Plymouth from Office of Rail Regulation statistics. Please note: methodology may vary year on year.
UK Railways portal

Plymouth railway station serves the city of Plymouth, Devon, England. It is situated on the northern edge of the city centre close to the North Cross roundabout. It has the largest number of passengers starting and finishing their journeys at any station in the county, and is the largest of the six surviving railway stations in the city, being the only one served by InterCity trains.

Originally named Plymouth North Road, it was opened in 1877 as a joint station for the Great Western Railway (GWR) and the London and South Western Railway (LSWR). It was expanded in 1908 but a major rebuilding scheme that started in 1938 was delayed by the Second World War and was not completed until 1962. John Betjeman commented unfavourably on its new form in his introduction to The Book of the Great Western:

Plymouth (North Road) dullest of stations and no less dull now it has been rebuilt in copybook contemporary.[1]

It is currently operated by First Great Western, being located on their Exeter to Plymouth line 225.75 miles (363 km) from London Paddington station,[2] but also sees trains operated by CrossCountry. The Panel Signal Box at the station controls all trains between Totnes in Devon, and Liskeard in Cornwall.

Contents

History

The first railway station in Plymouth was opened by the South Devon Railway on 2 April 1849[3] at Millbay, on the site now occupied by the Plymouth Pavilions. This company amalgamated with the GWR in 1876, just as the LSWR was completing its rival route from London to Plymouth.[4] North Road station was opened on 28 March 1877 to provide a joint facility for trains of both companies. It was just west of the earlier Mutley railway station, while at its west end a new junction allowed direct access to the Cornwall Railway and the LSWR's Devonport Kings Road railway station.

The station was built of wood and the platforms were fully covered by train sheds. It originally had just two through platforms but additional platforms were added in a scheme executed in 1908. Further major rebuilding work started in 1938; one signal box was replaced and the second moved to make way for the new works, and Houndiscombe Road bridge at the east end of the station was rebuilt. Work was soon stopped due to the Second World War but on North Road was increased when Millbay station had to be closed to passengers in 1941 following an air raid.[5]

The old LSWR Friary station was closed from 15 September 1958, following which North Road was renamed as just 'Plymouth'.[6] Further closures during the next few years of former LSWR stations and GWR branch lines has left just six stations in the city (Devonport, Dockyard, Keyham and two in St Budeaux – Victoria Road and Ferry Road)[7] – although local passengers also come from stations a little further afield such as Saltash, St Germans, Menheniot and Ivybridge.[2]

The rebuilding work was resumed in 1956 and the new station with its large office block, 'Intercity House', was formally opened by Dr Richard Beeching, the British Railways Chairman, on 26 March 1962.[5][6] The office block was intended to be the northern point of Armada Way, counterbalancing the tower of the Civic Centre at the southern end, in the Abercrombie/Paton-Watson 'Plan for Plymouth'.[8] The station now had seven through platforms, although two of these were converted to terminal bay platforms in 1974. One of these at the west end is usually used for the Tamar Valley Line service[9] but the longer east end bays were used for parcels and for Royal Mail trains until the withdrawal of this traffic from the area in 2003. Outside the station a car park was provided, which was rebuilt in its current multistorey form in the 1970s.[6]

Preceding station Historical railways Following station
Mutley   Great Western Railway   Plymouth Millbay
Great Western Railway Wingfield Villas
Mutley   London and South Western Railway   Devonport Kings Road

Signalling

Railways in the Plymouth area
Legend
Reading to Plymouth Line
Plympton (GWR)
South Devon and Tavistock Railway
Plymouth and Dartmoor Railway
Laira Junction
Laira TMD
Laira
LSWR to Turnchapel and GWR to Yealmpton
Plymouth Friary (LSWR)
Cattewater and Sutton Harbour
Mutley (Joint)
Plymouth North Road (Joint)
Plymouth Millbay (GWR)
Devonport Albert Road (GWR)
Devonport Kings Road (LSWR)
Dockyard (GWR)
Ford (Devon) (LSWR)
Keyham (GWR)
St Budeaux Ferry Road (GWR)
St Budeaux Victoria Road (LSWR)
LSWR to Gunnislake and to Exeter
GWR to Penzance

The station was originally controlled from two signal boxes. 'North Road East' was situated on the north side of the line to the east of the station, while 'North Road West' was on the south side of the line at the west end of the station where it could control the junction of the original lines to Millbay with the new Cornwall Loop Line to Devonport. The adjacent signal boxes were at Mutley to the east, Cornwall Junction on the Millbay line, and Devonport Junction at the far end of the Cornwall Loop.[10]

Both of the North Road boxes were closed in November 1908 and replaced by new ones with the same names. The West box was now situated on the north side of the line and had 59 levers, while the East box needed just 48. They were each 38 feet (11.6 m) long. Mutley box closed at the same time, the next box now being at Mannamead on the other side of Mutley Tunnel, which had opened about three years earlier.[10]

The rebuilding work of 1938 meant more signalling alterations. On 22 January 1938 the timber West box was lifted up and moved to a new position clear of the proposed works, being brought back into use on 27 January 1938. At the other end of the station the East box was closed and a new 79 feet (24.1 m) structure built, again on the north side of the line, which was brought into use on 25 June 1939.[10]

Both signal boxes were closed on 26 November 1960 when a new 'Plymouth Panel Signal Box' was opened on the west end of the new Platform 1; the West box was subsequently demolished. Multiple-aspect signals have controlled movements of trains throughout the Plymouth area since the opening of this new signal box in 1960. The adjacent boxes were initially at Laira Junction in the east and Keyham in the west.[10] The area of control was extended westwards on 2 July] 1973 to meet the signal box at St Germans, which in closed in 1998[11] so the next signal box westwards is now at Liskeard railway station. Towards the end of 1973 several more signal boxes were closed eastwards from Plymouth, which meant that Plymouth controlled trains until they reached the outer signal of Totnes Signal Box. Totnes box closed on 9 November 1987[6] when a new panel signal box at Exeter was opened.

Description

The station has its entrance on the south side which gives access to the city centre. The west side of the station concourse is the ticket office, while on the north and east sides are various retail outlets selling food and newspapers.[12] There is also a small buffet outlet on platforms 7 and 8. The platform area is separated from the concourse by ticket gates.

The platforms that can be reached on the level from the concourse are numbered 1 to 4. Platforms 1 and 2 are east-facing bay platforms, not used by passenger trains. Platform 3 is a west-facing bay platform that is mainly used by local services to Gunnislake and sometimes Penzance.[9][13]

The remaining platforms are reached by a subway immediately inside the ticket gates; there are lifts to the subway on each of the groups of platforms.[6] They are all through tracks and are signalled so that trains can arrive and depart in either direction.[13] Platform 4 is used by most through services towards Penzance, but also for some trains towards London. Platforms 5 and 6 are either side of the middle island platform and are used by a variety of services, including First Great Western local trains and long distance CrossCountry services. Platforms 7 and 8 are either side of a second island platform; there is a small coffee shop facing the subway steps on this platform. Most First Great Western High Speed Trains to London Paddington station depart from platform 7, but both these platforms are used by a variety of services from Cornwall towards London and the North as well as some local services.[9]

Beyond Platform 8 are two tracks, known as Park Sidings, which are used for stabling trains between services, but most trains are nowadays kept on the platform tracks between arrival and departure. There are some more sidings adjacent to platform 1. There is an extra track between platforms 4 and 5 for through goods trains and shunting manoeuvres.[13]

Services

Plymouth is served by First Great Western trains on the main line from London, some of which terminate at Plymouth but many continue over the Cornish Main Line to Penzance.[2] A number of prestigious named trains operate on this route including the Cornish Riviera, a fast London to Penzance service, and the overnight Night Riviera service on the same route.

Most CrossCountry trains from Scotland and the North of England via Bristol terminate at Plymouth, although three continue to Penzance in the evening and return the next morning.[14] On summer weekends some trains from Paddington and some from the North continue into Cornwall to serve Newquay.

Local services are provided by First Great Western along the Cornish Main Line and also on the Tamar Valley Line to Gunnislake.[7] A number of these continue eastwards on the London route to destinations such as Exeter St Davids.

Preceding station   National Rail   Following station
First Great Western Terminus
First Great Western
CrossCountry
Cornwall and Plymouth to the North

Passenger volume

Plymouth sees a larger number of passengers starting or finishing their journey than any other station in Devon, although Exeter St Davids has more passengers due to a larger number changing trains there. Comparing the year from April 2008 to that which started in April 2002, passenger numbers increased by 97%.[15]

  2002–03 2004–05 2005–06 2006–07 2007–08 2008–09 2009–10
Entries 721,187 767,066 822,804 929,105 1,018,941 1,344,641 1,139,359
Exits 710,487 751,945 806,207 916,808 1,007,910 1,344,640 1,139,359
Interchanges unknown 55,154 68,832 77,728 61,934 133,496 67,194
Total 1,431,674 1,585,165 1,697,843 1,923,686 2,088,785 2,822,777 2,345,912

The statistics cover twelve month periods that start in April.[15]

See also

References

  1. ^ Perry, George (editor) (1970). 'The Book of the Great Western. London: Sunday Times Magazine. ISBN 0-72300-018-2. 
  2. ^ a b c "National Rail Timetable 135 (Summer 2008)" (PDF). Network Rail. http://www.networkrail.co.uk/browse%20documents/eNRT/May08/timetables/Table135.pdf. Retrieved 2008-05-30. 
  3. ^ Gregory, R H (1982). The South Devon Railway. Salisbury: Oakwood Press. ISBN 0-853612-86-2. 
  4. ^ MacDermot, E T (1931). History of the Great Western Railway, volume II 1863-1921. London: Great Western Railway. 
  5. ^ a b Smith, Martin (1995). An Illustrated History of Plymouth's Railways. Caernarfon: Irwell Press. ISBN 1-817608-41-4. 
  6. ^ a b c d e Oakley, Mike (2007). Devon Railway Stations. Wimbourne: The Dovecote Press. ISBN 1-904349-55-6. 
  7. ^ a b "National Rail Timetable 139 (Summer 2008)" (PDF). Network Rail. http://www.networkrail.co.uk/browse%20documents/eNRT/May08/timetables/Table139.pdf. Retrieved 2008-05-30. 
  8. ^ Mosley, Brian. "A Plan for Plymouth". Encyclopedia of Plymouth History. Plymouth Data. http://www.plymouthdata.info/Plan%20for%20Plymouth.htm. Retrieved 2008-08-22. 
  9. ^ a b c "Plymouth". Live Departures and Arrivals. National Rail. http://www.livedepartureboards.co.uk/ldb/station.aspx?T=PLY. Retrieved 2008-07-22. 
  10. ^ a b c d Crozier, Larry (2000). Mechanical Signalling in Plymouth. Wallasey: Signalling Record Society. ISBN 1-873228-18-X. 
  11. ^ Pryer, GA. Signal Box Diagrams of the Great Western & Southern Railways, Volume 14: GWR Lines Plymouth and East Cornwall. Weymouth: GA Pryer. ISBN 0-953246-05-1. 
  12. ^ "Plymouth". Station Facilities. National Rail. http://www.nationalrail.co.uk/stations/PLY/details.html#Station_Facilities. Retrieved 2008-07-22. 
  13. ^ a b c Jacobs, Gerald (2005). Railway Track Diagrams Book 3: Western. Bradford-on-Avon: Trackmaps. ISBN 0-954986-61-X. 
  14. ^ "National Rail Timetable 51 (Summer 2008)" (PDF). Network Rail. http://www.networkrail.co.uk/browse%20documents/eNRT/May08/timetables/Table51.pdf. Retrieved 2008-05-30. 
  15. ^ a b "Station Usage". Rail Statistics. Office of Rail Regulation. http://www.rail-reg.gov.uk/server/show/nav.1529. Retrieved 2010-03-25. 

Further reading

External links

This station offers access to the South West Coast Path
Distance to path 1 mile (1.6 km)
Next station anticlockwise Kingswear 65 miles (105 km)
Next station clockwise Looe 21 miles (34 km)